Case #3 (Danshui Plant No. 2) – Instructions
I would like to see all of your calculations as a part of your write-up (except for Question 3). For Q3, please attach any relevant tables as an appendix.
Question 1: You’ll use the data provided in the first column of Exhibit 3 to calculate the break-even point (see chapter 3 lecture notes for details).
Question 2: You’ll just compute the expected and actual total cost per unit.
Question 3: Prepare a table with four columns: (1) flexible budget, (2) actual results, (3) variances, and (4) a column indicating whether a variance is favorable or unfavorable. Attach this table to the end of your write-up.
Question 4: You’ll calculate the following: (1) the price and usage variance for the flash memory material cost, (2) the price and usage variance for the labor cost, and (3) the total variance for the overhead cost.
Read the August Report (page 3) carefully. In this case, you don’t need the standard labor price information in order to calculate the labor price and usage variance. But, note that the standard labor price (or rate) is $0.92 per hour just in case you cannot figure out how to calculate the variances without using that information.
Question 5: Think about the various cost variances (i.e., materials, labor, overhead) you calculated. Which one(s) should be the major concern for the manager? What are the causes of these variances (i.e., price variance or efficiency variance)? How can the manager solve these issues? Also, how many units per month does the company need to produce for Apple? Has the company been able to meet that target? If not, what should the manager do in the next month or so to fulfill their contractual obligation? How would your proposed actions impact the profitability of the Danshui…...

Similar Documents

Danshui Plant No. 2

...9-913-525 SEPTEMBER 28, 2012 WILLIAM BRUNS JULIE H. HERTENSTEIN KELVIN LIU Danshui Plant No. 2 In August 2010, Wentao Chen, manager of Danshui Plant No. 2 in southern China, was anxious. The plant was in the third month of a 12-month contract to assemble the Apple iPhone 4. The contract called for Danshui to assemble 2.4 million iPhones in the period between June 1, 2010, and May 31, 2011, but now in the third month of the contract, production was only 180,000 units per month. Chen called Jianye Ma, the plant controller, to request a summary of monthly operations for August as soon after the end of the month as possible. Danshui was a contract manufacturer that assembled electronic products for companies wishing to save labor costs by locating in southern China where semiskilled labor was available for less than one dollar an hour. Manufacturers like Danshui assembled parts in large plants using assembly line techniques according to specifications of the international companies that contracted with them for assembly and final testing. The largest contract manufacturer in China was Foxconn, a division of the Hon Hai Group of Taiwan, with more than 800,000 workers in China alone and contracts to supply Apple, Dell, and Hewlett Packard among others. In expectation of high demand for the iPhone 4, Apple had contracted with Danshui to assemble iPhones in Plant No. 2, which had been assembling computer hard drives on a contract that was fulfilled at the end of May 2010.......

Words: 1735 - Pages: 7

Danshui Plant No.2

...9-913-525 SEPTEMBER 28, 2012 WILLIAM BRUNS JULIE H. HERTENSTEIN KELVIN LIU Danshui Plant No. 2 In August 2010, Wentao Chen, manager of Danshui Plant No. 2 in southern China, was anxious. The plant was in the third month of a 12-month contract to assemble the Apple iPhone 4. The contract called for Danshui to assemble 2.4 million iPhones in the period between June 1, 2010, and May 31, 2011, but now in the third month of the contract, production was only 180,000 units per month. Chen called Jianye Ma, the plant controller, to request a summary of monthly operations for August as soon after the end of the month as possible. Danshui was a contract manufacturer that assembled electronic products for companies wishing to save labor costs by locating in southern China where semiskilled labor was available for less than one dollar an hour. Manufacturers like Danshui assembled parts in large plants using assembly line techniques according to specifications of the international companies that contracted with them for assembly and final testing. The largest contract manufacturer in China was Foxconn, a division of the Hon Hai Group of Taiwan, with more than 800,000 workers in China alone and contracts to supply Apple, Dell, and Hewlett Packard among others. In expectation of high demand for the iPhone 4, Apple had contracted with Danshui to assemble iPhones in Plant No. 2, which had been assembling computer hard drives on a contract that was fulfilled at the end of May 2010.......

Words: 1735 - Pages: 7

Danshui Plant No. 2

...9-913-525 SEPTEMBER 28, 2012 WILLIAM BRUNS JULIE H. HERTENSTEIN KELVIN LIU Danshui Plant No. 2 In August 2010, Wentao Chen, manager of Danshui Plant No. 2 in southern China, was anxious. The plant was in the third month of a 12-month contract to assemble the Apple iPhone 4. The contract called for Danshui to assemble 2.4 million iPhones in the period between June 1, 2010, and May 31, 2011, but now in the third month of the contract, production was only 180,000 units per month. Chen called Jianye Ma, the plant controller, to request a summary of monthly operations for August as soon after the end of the month as possible. Danshui was a contract manufacturer that assembled electronic products for companies wishing to save labor costs by locating in southern China where semiskilled labor was available for less than one dollar an hour. Manufacturers like Danshui assembled parts in large plants using assembly line techniques according to specifications of the international companies that contracted with them for assembly and final testing. The largest contract manufacturer in China was Foxconn, a division of the Hon Hai Group of Taiwan, with more than 800,000 workers in China alone and contracts to supply Apple, Dell, and Hewlett Packard among others. In expectation of high demand for the iPhone 4, Apple had contracted with Danshui to assemble iPhones in Plant No. 2, which had been assembling computer hard drives on a contract that was fulfilled at the end of May 2010.......

Words: 1735 - Pages: 7

Danshui Plant No. 2

...9-913-525 SEPTEMBER 28, 2012 WILLIAM BRUNS JULIE H. HERTENSTEIN KELVIN LIU Danshui Plant No. 2 In August 2010, Wentao Chen, manager of Danshui Plant No. 2 in southern China, was anxious. The plant was in the third month of a 12-month contract to assemble the Apple iPhone 4. The contract called for Danshui to assemble 2.4 million iPhones in the period between June 1, 2010, and May 31, 2011, but now in the third month of the contract, production was only 180,000 units per month. Chen called Jianye Ma, the plant controller, to request a summary of monthly operations for August as soon after the end of the month as possible. Danshui was a contract manufacturer that assembled electronic products for companies wishing to save labor costs by locating in southern China where semiskilled labor was available for less than one dollar an hour. Manufacturers like Danshui assembled parts in large plants using assembly line techniques according to specifications of the international companies that contracted with them for assembly and final testing. The largest contract manufacturer in China was Foxconn, a division of the Hon Hai Group of Taiwan, with more than 800,000 workers in China alone and contracts to supply Apple, Dell, and Hewlett Packard among others. In expectation of high demand for the iPhone 4, Apple had contracted with Danshui to assemble iPhones in Plant No. 2, which had been assembling computer hard drives on a contract that was fulfilled at the end of May 2010.......

Words: 1735 - Pages: 7

Danshui Plant No.2

...9-913-525 SEPTEMBER 28, 2012 WILLIAM BRUNS JULIE H. HERTENSTEIN KELVIN LIU Danshui Plant No. 2 In August 2010, Wentao Chen, manager of Danshui Plant No. 2 in southern China, was anxious. The plant was in the third month of a 12-month contract to assemble the Apple iPhone 4. The contract called for Danshui to assemble 2.4 million iPhones in the period between June 1, 2010, and May 31, 2011, but now in the third month of the contract, production was only 180,000 units per month. Chen called Jianye Ma, the plant controller, to request a summary of monthly operations for August as soon after the end of the month as possible. Danshui was a contract manufacturer that assembled electronic products for companies wishing to save labor costs by locating in southern China where semiskilled labor was available for less than one dollar an hour. Manufacturers like Danshui assembled parts in large plants using assembly line techniques according to specifications of the international companies that contracted with them for assembly and final testing. The largest contract manufacturer in China was Foxconn, a division of the Hon Hai Group of Taiwan, with more than 800,000 workers in China alone and contracts to supply Apple, Dell, and Hewlett Packard among others. In expectation of high demand for the iPhone 4, Apple had contracted with Danshui to assemble iPhones in Plant No. 2, which had been assembling computer hard drives on a contract that was fulfilled at the end of May 2010.......

Words: 1790 - Pages: 8

Danshui Plant No.2 Case Study

...Danshui Plant No.2 Case Study Yuli Tang Rui Zhang Due Date: April 9, 2013 1. As we can see from the Exhibit 1, 176,087 Apple iPhone 4’s would have to have been completed for Danshui Plant No.2 to break even. 2. The total expected cost per unit was $205.7 per unit and the actual cost per unit was $211.93 per unit. See Exhibit 2. 3 & 4. The data is showing in the Exhibit 3 & 4. 5. From the data of question 3, the variance of revenue is favorable because Apple increased price of flash memory by $2. However the company didn’t gain profits from the revenue due to the increased price of flash memory provided by Samsung. The variance of flash memory is unfavorable because of two reasons: first reason is the price of each unit raised $2; the second reason is the company damaged 1,000 units of flash memory. So company used more flash memories than expected. The variance of 8 other chips is favorable, we cannot say the amount of chips decreased, so it should be the price of chips went down. The variance of supplies and tools is unfavorable. We think there are two reasons: company used the supplies and tools less efficient which means used more of supplies and tools, or company spend more money on purchase supplies and tools. The variance of labor is unfavorable, due to the wages of labor increased and working hours also increased, it was inefficient. The supervision is unfavorable because of the salary of supervisor increased. In conclusion, the actual net income is...

Words: 939 - Pages: 4

Danshui Plant No.2

...Question for Danshui Plant No. 2 1. Using budget data, how many Apple iPhone 4’s would have to have been completed for Danshui Plant No.2 to break even? Variable Costs: 187.89 + 13.11 + 1.06 = $202.06 per unit Fixed Costs: $729,000 per month Revenue: 41,240 / 200 = $206.2 per unit Contribution Margin = 206.2 - 202.06 = $4.14 per unit Break-even = 729,000 / 4.14 = 176,086.96 units Answer : 176,087 iPhones 2. Using budget data, what was the total expected cost per unit if all manufacturing and shipping overhead (both variable and fixed) were allocated to planned production? What was the actual cost per unit of production and shipping? Total Expected Cost per unit: 41,140,000 / 200,000 = $205.7 per unit Actual Cost Per Unit: 38,148,000 / 180,000 = $211.93 per unit 3. Prepare a flexible budget for 180,000 iPhone 4’s and calculate flexible budget variance using actual cost for August. Flexible Budget Actual Variance  Number of Units                 180,000             180,000                       -    *Values in Thousands of Dollars ($) Revenue                   37,116               37,476 360 F  Variable Costs:  Materials  Flash memory                     4,860                ...

Words: 660 - Pages: 3

Danshui Case Study

...REFERENCES 12 INTRODUCTION AND MAIN ISSUES Danshui was a contract manufacturer that assembled electronic products for companies wishing to save labour costs by locating in southern China. Because of high demand for iPhone 4, Apple had contracted with Danshui to assemble iPhone in Plant No. 2. The contract need Danshui to assemble 2.4 million iPhone in the period between June 1, 2010 and May 31, 2011. Wentao Chen, manager of Danshui Plant No. 2 was worried because in the third month of the contract production was only 180,000 units per month. Suppose to produce 2.4 million iPhone its need 200,000 units per month. After preliminary budget has come out, the company loss of $672,000. The main issue of this case is the break contract between Danshui and Apple. The contract called Danshui to assemble 2.4 million in the period of one year, but Danshui only can produce 180,000 units per months. If Danshui still can produce that amount, it can’t reach 2.4 million in one year. This might happen because Danshui cannot find people to hire, even though they have raised wages by almost 30%. Another reason is they have problem with the Samsung flash memory installation. One thousand flash memories were damaged in August. Samsung is aware of this problem and has begun to install a shield to prevent the damage. However, it is just for prevention in the short time. Due to the contract has not been fulfilled, Danshui may be needed to pay back a lot of money for the......

Words: 2251 - Pages: 10

Case #3 Danshui Plant No.2

...Case #3 Danshui Plant No.2 Answers 1. The break-even point for Danshui plant no 2 is 175874.54 units. The calculation of this number is simply from the break-even formula, fixed costs divided by contribution margin per unit. Fixed costs for the plant were 729 000 and the contribution margin is revenue minus variable costs which equals to 829 000 and the CM per unit is 829 000 / 180 000 which is 4,145. The break-even is therefore 175874.54 units. 2. The actual and expected cost per unit was 211,919 and 205,705 respectively. These numbers can be computed simply by dividing the total cost given in preliminary report-Exhibit 3 of the case- by the number of units. For actual cost per units it would be actual total costs which is 38 148 divided by 180 000 which will give 205.705 and for the expected cost per units, it is 41 140 divided by 200 000 which will give 211,919. 3. See exhibit 1 4. The price variance for the flash memory is equal to 362 000, it is calculated by multiplying 181 000 which is the actual quantity by the price difference (29-27) which is 2. The reason why the actual quantity is 181 000 and not 180 000 is because of the fact that in the production process, there were a thousand flash memories that were damaged. Therefore they actually used 181 000 flash memories. The usage variance is 27 000 and it is calculated by multiplying the standard price which is 27 by the quantity difference which is 1 000 (181 000- 180 000). ......

Words: 797 - Pages: 4

Danshui Plant No.2

...Hertenstein and Assistant Professor Kelvin Liu of Northeastern University prepared this case solely as a basis for class discussion and not as an endorsement, a source of primary data, or an illustration of effective or ineffective management. Despite occasional references to actual companies, this case is fictitious and any resemblance to actual persons or entities is coincidental. Copyright © 2012 President and Fellows of Harvard College. To order copies or request permission to reproduce materials, call 1-800-545-7685, write Harvard Business Publishing, Boston, MA 02163, or go to http://www.hbsp.harvard.edu. This publication may not be digitized, photocopied, or otherwise reproduced, posted, or transmitted, without the permission of Harvard Business School. WILLIAM BRUNS JULIE H. HERTENSTEIN KELVIN LIU Danshui Plant No. 2 In August 2010, Wentao Chen, manager of Danshui Plant No. 2 in southern China, was anxious. The plant was in the third month of a 12-month contract to assemble the Apple iPhone 4. The contract called for Danshui to assemble 2.4 million iPhones in the period between June 1, 2010, and May 31, 2011, but now in the third month of the contract, production was only 180,000 units per month. Chen called Jianye Ma, the plant controller, to request a summary of monthly operations for August as soon after the end of the month as possible. Danshui was a contract manufacturer that assembled electronic products for companies......

Words: 1738 - Pages: 7

Danshui Plant No. 2

...Overview: Apple Corporation released iPhone 4 on June 24, 2010 and sold more than 1.7 million units in the first three days. To prepare for the launch of the new product, Apple contracted with the Danshui Plant No. 2 to assemble the new iPhones. Danshui Plant No.2, a contract manufacturer in southern China that assembles electronic products for companies wishing to save on labor costs, received a one-year contract starting on June 1, 2010 with the Apple Corporation to assemble 2.4 million iPhone 4s. In the first three months of the contract it became obvious that the plant was unable to assemble the expected 200,000 iPhones per month and was operating at a loss. Although the plant is known for hiring semi-skilled workers, the new iPhone contract required a complex assembly process entirely based on handwork by 325 workers, with 140 steps involving 100 components during 5 days. To anticipate the need for qualified workers, Danshui had raised their factory wages by almost 30%. But even with the wage increase, Danshui was not able to hire enough qualified workers to assemble the complex new product. Another issue was that, based on original modeling, Danshui was actually operating at a loss and was unable to fill the expected 200,000 per month iPhone quota in the first three months. To begin analyzing the root causes for the shortfall, the controller had considered preparing a “flexible budget” to provide a more realistic comparison of the performance to the budget. If the...

Words: 2032 - Pages: 9

Danshui Case

...Apple Corporation released iPhone 4 on June 24, 2010 and sold more than 1.7 million units in the first three days. To prepare for the launch of the new product, Apple contracted with the Danshui Plant No. 2 to assemble the new iPhones. Danshui Plant No.2, a contract manufacturer in southern China that assembles electronic products for companies wishing to save on labor costs, received a one-year contract starting on June 1, 2010 with the Apple Corporation to assemble 2.4 million iPhone 4s. In the first three months of the contract it became obvious that the plant was unable to assemble the expected 200,000 iPhones per month and was operating at a loss. Although the plant is known for hiring semi-skilled workers, the new iPhone contract required a complex assembly process entirely based on handwork by 325 workers, with 140 steps involving 100 components during 5 days. To anticipate the need for qualified workers, Danshui had raised their factory wages by almost 30%. But even with the wage increase, Danshui was not able to hire enough qualified workers to assemble the complex new product. Another issue was that, based on original modeling, Danshui was actually operating at a loss and was unable to fill the expected 200,000 per month iPhone quota in the first three months. To begin analyzing the root causes for the shortfall, the controller had considered preparing a “flexible budget” to provide a more realistic comparison of the performance to the budget. If the plant...

Words: 344 - Pages: 2

Analysis of Danshui Plant No.2

...Introduction Danshui was a contract manufacturer that assembled electronic products located in Southern China. Danshui has a contract to assemble 2.4 million iPhones within the period from 1st June 2010 to 31st May 2011 and their current production is only 180,000 units per month compared to planned production is 200,000 units. Danshui is using semiskilled labor for less than 1 dollar an hour and assembly line technique. Due to high demand of IPhone 4, Apple had contracted with Danshui to assemble iphones in Plant No. 2. A budget had been prepared soon after iPhone contract was signed. Therefore, Danshui plant manager, Wentao Chen was responsible to control all costs including materials, labor, overhead and shipping. IPhone 4 contained more than 100 components including flash memories, application processor, chip for phone calls, gyroscope and etc. Therefore, each worker will need to focus more than one task in a short period of time due to its assembly line toward completion. The assembly process entirely based on handwork by workers, where there are 140 steps in assembly process to be done by 325 individuals during 5 working days. The August Report had shown a loss of $672,000 although budget is $100,000, this is due to unable to produce 200,000 iPhone 4 units on demand. The major obstacle is not hiring enough qualified labor although wages was raised by 30% since July. Besides, flash memory installation also causing a trouble where they can be damaged by heat if......

Words: 3021 - Pages: 13

Danshui Plant No.2 Case Study

...Danshui Plant No.2 1. Variable Costs = Material Cost + Labor Cost + Shipping Cost = 187.89+13.11+1.06 = 202.06 / Unit Fixed Costs = 729,000 / Month Price = 41,240,000 / 200,000 = 206.2 Contribution Margin = 206.2-202.6 = 4.14 / Unit When it comes to the break even, Contribution margin * Unit(BE) = Fixed Costs. Unit(BE) = 729,000 / 4.14 = 176,086.96, So the break even for Danshui is 176,087. 2. Based on the data in Exhibit 3, Total expected cost / Unit = 41,140,000 / 200,000 = $205.7 / Unit Actual cost / Unit = 38,148,000/180,000 = $211.93 / Unit 3. Flexible Budget | Budget(180,000) | Actual(180,000) | Variance | Revenue | 37,116 | 37,476 | 360 F | Variable Costs: | | | | Materials | | | | Flash memory | 4,860 | 5,249 | 389 U | Application process | 1,935 | 1,935 | | Chips-phone | 2,529 | 2,529 | | Gyroscope | 468 | 468 | | 8 other chips | 12,771 | 12,643 | 128 F | Variable supplies and tools | 11,257.2 | 11,305 | 47.8 U | Subtotal | 33,820,2 | 34,124 | 303.8 U | Labor | | | | Assembly and packaging | 2,359.8 | 3,092 | 732.2 U | Shipping | 190.8 | 191 | 0.2 U | Total variable costs | 36,730.8 | 37,412 | 1041.2 U | Fixed costs: | | | | Factory rent | 400 | 400 | | Machine depreciation | 150 | 150 | | Utility fee and taxes | 52 | 52 | | Supervision | 127 | 134 | 7 U | Total fixed costs | 729 | 736 | 7 U | Total costs | 37,099.8 | 38,148 | 1,048.2 U | Net......

Words: 335 - Pages: 2

Solution to Danshui Case

...Solution to Danshui Case Danshui Plant No.2 1. Variable Costs = Material Cost + Labor Cost + Shipping Cost = 187.89+13.11+1.06 = 202.06 / Unit Fixed Costs = 729,000 / Month Price = 41,240,000 / 200,000 = 206.2 Contribution Margin = 206.2-202.6 = 4.14 / Unit When it comes to the break even, Contribution margin * Unit(BE) = Fixed Costs. Unit(BE) = 729,000 / 4.14 = 176,086.96, So the break even for Danshui is 176,087. 2. Based on the data in Exhibit 3, Total expected cost / Unit = 41,140,000 / 200,000 = $205.7 / Unit Actual cost / Unit = 38,148,000/180,000 = $211.93 / Unit 3. Flexible Budget | Budget(180,000) | Actual(180,000) | Variance | Revenue | 37,116 | 37,476 | 360 F | Variable Costs: | | | | Materials | | | | Flash memory | 4,860 | 5,249 | 389 U | Application process | 1,935 | 1,935 | | Chips-phone | 2,529 | 2,529 | | Gyroscope | 468 | 468 | | 8 other chips | 12,771 | 12,643 | 128 F | Variable supplies and tools | 11,257.2 | 11,305 | 47.8 U | Subtotal | 33,820,2 | 34,124 | 303.8 U | Labor | | | | Assembly and packaging | 2,359.8 | 3,092 | 732.2 U | Shipping | 190.8 | 191 | 0.2 U | Total variable costs | 36,730.8 | 37,412 | 1041.2 U | Fixed costs: | | | | Factory rent | 400 | 400 | | Machine depreciation | 150 | 150 | | Utility fee and taxes | 52 | 52 | | Supervision | 127 | 134 | 7 U | Total fixed costs | 729 | 736 | 7 U | Total costs | 37,099.8 |......